|
Build Your Online Product Catalogs?
Product Name: |
packaged sewage treatment plant
|
Supply Ability: |
200 million |
Related proudcts |
sewage treatment pla, |
Specifications |
YMDM-50 |
Price Term: |
FOB |
Port of loading: |
QINGDAO |
Minimum Order |
1 SET |
Unit Price: |
11580 |
|
Technical process:
(1)Equalize tank: reinforced concrete structure, used to homogenize water volume and quality.
(2)Primary settling tank:the sewage ascending flow rate in this tank is 0.2-0.3mm/S, the settling sludge will lifting to sludge storage tank by Solid air lift.
(3) Contact oxidation tank: the primary settling sewage will flow into here proceeding biochemical treatment, it can divide three-level, the total retention time is 4-6h, padding is novelty elastic padding, easy to membrane, no blocking, padding/surface area is 160m2/m3, gas-water ratio is about 12:1.
(4) Second settling tank: the sewage after biochemical treatment will flow into second settling pond, ascending flow rate is 0.1-0.15mm/s,surface loading less than 1.0m3/m2.h, discharge sludge using air lift to sludge storage tank.
(5) Disinfection pond:
(6) Sludge storage tank: all sludge in the primary settling tank and second settling tank need air lifting to sludge storage pond, then proceeding aerobic digestion, the supernatant liquor in sludge storage tank backflow into contact oxidation pond reprocessing , the surplus sludge is very little, it need clean 1 time every 1-2 years usually, cleaning manner can be use fecing suction truck stretch into sludge tank bottom from manhole of sludge storage tank sucking it and transport outward.
(7) Air blower room: it set up above the sterilization tank, its inlet adopt two layer sound-proofing, the air intake has muffler ,fan filter, no noise when operation, air blower adopt two units L type roots blower , which can automatic replace operation, unit blower operation life about 30000h.
Technology process:
The effluent water from septic tank will first flow into grilling well , the grilling can remove bigger suspended matter, seston and ribbon in sewage, then flow into equalize tank, the equalize tank function is equalize sewage volume and quality, make the sewage enter into the integrated sewage treatment equipment by lifting pump.
|
Company: |
Qingdao Yimei Environment Project Co.,LTD
|
Contact: |
Ms. cathy tan |
Address: |
No 386,Hai Bin Five Road ,Jiaonan |
Postcode: |
266400 |
Tel: |
86-0532-88180456 |
Fax: |
86-0532-88180610 |
E-mail: |
|
|
|
|